• mkwt@lemmy.world
    link
    fedilink
    arrow-up
    7
    arrow-down
    1
    ·
    6 months ago

    CDR time!

    (except I’ve had CDRs that were scheduled for a full work week, 40 hours)

      • ripcord@lemmy.world
        link
        fedilink
        arrow-up
        12
        ·
        6 months ago

        Canada’s Drag Race? Corel DRaw? Climate Data Record? Carbon Dioxide Removal??

        Man, Carbon Dioxide Removal for a full week…

      • mkwt@lemmy.world
        link
        fedilink
        arrow-up
        2
        ·
        6 months ago

        Critical Design Review. In aerospace engineering, it happens when drawings and software are substantially complete, but before starting to cut metal. The goal is to provide some assurance that the design will actually comply with the system requirements.

        CDRs are usually presented as a single PowerPoint deck that can run to thousands of slides, with many presenters and dozens of review panel members.

        • Timecircleline@sh.itjust.works
          link
          fedilink
          arrow-up
          1
          ·
          6 months ago

          Interesting! I operate fully outside of the realm of aerospace engineering, so this is news to me. I take it this is an opportunity for anyone to speak up if they have any concerns with any aspect of the design before it moves to the production phase?