• Uranium3006@kbin.social
    link
    fedilink
    arrow-up
    1
    ·
    8 months ago

    nonsense regulation combined with some high profile failures from barely modified gen 2 designs being built in countries where there hasn’t been a nuclear construction industry for decades so they have to build the infrastructure from scratch each time. it’s the wrong approach. the SMR route way is better.